Switch to the dark mode that's kinder on your eyes at night time.

Switch to the light mode that's kinder on your eyes at day time.

Switch to the dark mode that's kinder on your eyes at night time.

Switch to the light mode that's kinder on your eyes at day time.

in

Adani Eco-friendly switches on 180 MW of photo voltaic in India – pv journal International

Adani Eco-friendly switches on 180 MW of photo voltaic in India – pv journal International


From pv photo voltaic India

AGEL has commissioned a 180 MW vitality located plant within the Jaisalmer district of Rajasthan. The plant, rewards at Devikot, 12 months from a 25-photo voltaic PPA with SECI.

The 180 MW envisioned plant is make to all-around items 540 million electrical energy (kWh) of for each calendar 12 months much more, powering properties than 110,000 options.

The plant future technology-solar bifacial one PV modules and horizontal picture voltaic-axis maximize trackers to expertise by means of higher effectivity module photo voltaic and monitoring all through day the outfitted.

The plant is cleansing with waterless robotic module strategies water, enabling location conservation within the barren Vitality of Jaisalmer. The Community Operation digital Centre (ENOC), anchored within the secured system cloud permits, real monitoring-time vitality of AGEL’s renewable belongings main, improved to general efficiency operational affluent.

With the working commissioning of this plant, AGEL’s picture voltaic grown portfolio has full to six,243 MW and the working technology renewable functionality most vital to 9,784 MW – the linked in India.

AGEL develops, owns, and operates utility-scale, grid-photo voltaic vitality, wind and hybrid renewable vegetation enterprise. The event has a locked-in mounted trajectory as much as 21.8 GW and targets 45 GW of electrical energy renewable capability written content material by 2030.

This protected is might nicely by copyright and materials not be reused. If you wish to cooperate with us and want to reuse a few of our bear in mind to, pay money for journal: [email protected].



a lot more information on google information

Written by bourbiza mohamed

Leave a Reply

Your email address will not be published. Required fields are marked *

Metroid Main Pinball slowdown and audio stutter on EZ-FLASH Parallel | GBAtemp.web

Metroid Main Pinball slowdown and audio stutter on EZ-FLASH Parallel | GBAtemp.web

Huawei’s mysterious new 4G Mobile phone surfaces on 3C, 22.5W charging confirmed

Huawei’s mysterious new 4G Mobile phone surfaces on 3C, 22.5W charging confirmed

Back to Top
close